澹台湖大桥水中墩基础施工

Construction of In-Water Pier Foundations of Tantai Lake Bridge
下载PDF
导出
摘要 澹台湖大桥主桥上部结构为三跨(40m+96m+40m)钢管拱-连续混凝土箱梁组合体系,南北引桥上部结构为预应力混凝土连续箱梁,全桥基础均采用钻孔灌注桩。介绍了水中墩施工筑岛方案的比选和水中墩钻孔桩及承台施工所遇到的问题及其解决的方法,其经验对水中基础施工有一定参考意义。 The superstructure of the main bridge of Tantai Lake Bridge is a hybrid structure of steel tube arch and prestressed concrete continuous box girders with span arrangement (40+96+40) m, and that of the approach spans on either south or north side of the Bridge are also prestressed concrete continuous box girders, with foundations of the overall bridge designed as bored piles. In this paper, the comparison and selection of artificial island schemes for construction of the bored pile foundations of the in-water piers are presented, and the technical problems encountered in the construction of the bored piles, pile caps, and solutions to the problems are described as well. The experiences from the construction of the pile foundations herewith may be of certain reference to the construction of the type of foundations of in-water piers elsewhere.
作者 王庆曾
出处 《桥梁建设》 EI CSCD 北大核心 2005年第B06期101-103,共3页 Bridge Construction
关键词 钻孔灌注桩 承台 筑岛施工 桥梁施工 bored pile pile cap construction with artificial island bridge construction
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部