摘要
针对目前重力式码头续建二期工程在新旧码头接头段基床整平施工工艺中存在的问题,提出“趁高潮”施工的工艺,并对此工艺所涉及的有关问题进行讨论。
To counter the problems of bed leveling construction technology for the connecting part of new-old wharves in Phase II Extension Project of gravity wharf, this paper puts forward the construction technology of "construction at high tide", and discusses some problems related to this technology.
出处
《水运工程》
北大核心
2006年第7期31-32,共2页
Port & Waterway Engineering
关键词
重力式码头
续建工程
接头段
gravity wharf
extension project
connecting part