无桩尖管桩锤打过程易造成管桩移位、内伤、断桩、嵌岩差、持力层锚固长度小。
Shift,internal injury, breaking, bad imbedded in rook,as well as short anchorage distance etc. minght happen for the tube pile without pile toe during the hammering period.
出处
《福建建筑》
2006年第4期58-58,共1页
Fujian Architecture & Construction
关键词
桩尖
移位
断桩
嵌岩
锚固长度
Pile toe, Shift, Breaking, Imbedded in rock, Anchorage distance