摘要
广州地铁二号线工程地质分层特征张定邦,李慈(广东省水利电力勘测设计研究院)GeologicStratumBehaviourofGuangzhouSubwayNo.2Project¥ZhangDingbang;LiCi(GuangdongSurveya...
Abstract: The No. 2 Project of Guangzhou Subway not only has long distance, but encounters strata with variety of rock feature and complicated engineering geologic condition.This paper introduces the engineering geologic strata along the line as well as the stratum behaviour.