摘要
该文以杨高中路电力隧道工程为例,对大口径长距离深大隧道的曲线顶管对接施工的设备选型、对接施工关键技术措施和施工方法以及安全、质量方面的施工应急措施进行了探讨总结。
Taking the electrical tunnel project in Yanggao Road(M)as an example,the article discusses and sums up the selection of the equipment,the key technical measures and the construction method,and the emergent measures of the construction in the aspects of safety and quality for the butting construction of the curve jacking pipe in the large-aperture long-distance deep tunnel.
出处
《城市道桥与防洪》
2006年第4期40-44,共5页
Urban Roads Bridges & Flood Control
关键词
曲线顶管
对接
轴线控制
掘进机
注浆加固
curve jacking pipe,butting,axis control,entry-driving machine,grouting reinforcement