摘要
该文介绍了武汉新区四新地区10#地块吹填砂场平工程的工程背景及地质条件,并从场平竖向设计、围埝设计、覆土填筑三方面介绍了该工程的吹填设计。
The article introduces the engineering background and the geological conditions of 10# Land Sand-Blowing and Sand-Filling Ground Leveling Project in Sixin Area of New Zone in Wuhan,and introduces the blowing and filling design of this project from three aspects of the vertical design of ground leveling,the design of enclosing banks between fields and the filling of covering soil.
出处
《城市道桥与防洪》
2006年第4期44-46,共3页
Urban Roads Bridges & Flood Control
关键词
吹填砂场平
竖向设计
围埝设计
覆士填筑
武汉市
sand-blowing and sand-filling ground leveling,vertical design,design of enclosing banks between fields,filling of covering soil,Wuhan City