装配生产线任务完成时间延迟的响应策略 被引量:1

The Response Strategies of Task Completion Delay in Assembly Line
下载PDF
导出
摘要 针对实际装配生产线中由各种干扰引起的任务完成时间延迟,将不平衡问题缩小到动态响应区,并基于局部搜索算法的基本原理以及数组的读取规则,编制了改进的嵌套式搜索算法.分别制定了单个和多个动态工人时的响应策略,得出多人共同服务整个生产线的策略优于分别服务策略,且用算例分析验证了这种策略的有效性. In view of the task completion delay caused by various disturbances in an actual assembly line, the unbalanced problem was reduced to dynamic response area. And based on the essential principle of local search algorithm and reading rule of array, an improved nested search algorithm was compiled. In the case of single dynamic worker and several dynamic workers, different response strategies were established, respectively. It was concluded that the strategy that several dynamic workers serve the whole assembly line corporately is better than the respective serving strategy. The strategy's effectiveness was validated by the analysis of example.
作者 梁燕 金烨
出处 《上海交通大学学报》 EI CAS CSCD 北大核心 2006年第7期1222-1225,共4页 Journal of Shanghai Jiaotong University
关键词 装配生产线 任务完成时间延迟 局部搜索算法 嵌套式搜索算法 assembly line task completion delay local search algorithm nested search algorithm
  • 相关文献

参考文献3

二级参考文献8

  • 1Zhou M C. Petri Nets in Flexible and Agile Automation [M]. Boston; Kluwer Academic Publishers Group, 1995.
  • 2Ramaswamy S, Valavanis K P. Modeling, analysis and simulation of failures in a materials handling system using extended Petri nets [J]. IEEE Tran on Systems, Man, and Cybernetics, 1994, 24: 1358-1373.
  • 3Audry N, Demongodin I, Prunet F. Modeling of high throughput production lines by using generic models described in batches Petri nests [A]. Proc Int IEEE Conf Robotics and Automation [C]. San Diego, CA, 1994. 807-812.
  • 4Mohamed A, Hassane A. Modeling and simulation of an electronic component manufacturing system using hybrid Petri nets [J]. IEEE Tran Semiconductor Manufacturing, 1998, 11(3): 374-383.
  • 5Rene D. Petri Net and Grafcet I-M3. London: Prentice Hall International(UK) Ltd, 1992.
  • 6Drath R. Visual Object Net ++ 2.0a [EB/OL]. http://www. systemtechnik. tu-ilmenau. de/ - drath /visual_e.htm/, 2000.
  • 7董斌,李颢,邵惠鹤,王洪水.基于遗传算法的一类Job-shop调度[J].控制与决策,1998,13(1):71-74. 被引量:15
  • 8李郝林.基于生物遗传算法的FMS生产调度算法[J].机械工程学报,2000,36(9):91-93. 被引量:21

共引文献6

同被引文献6

  • 1曹振新,朱云龙,赵明扬,尹朝万,李富明.混流装配线负荷平衡与投产排序的优化研究[J].信息与控制,2004,33(6):660-664. 被引量:24
  • 2张德富,李新.求解作业车间调度问题的快速启发式算法[J].计算机集成制造系统,2005,11(2):237-241. 被引量:11
  • 3Bock S,Rosenberg O,Brackel T V.Controlling mixed-model assembly lines in real-time by using distributed systems[J].International Journal of Production Research,2004,42(9):880-904.
  • 4Vilarinho P M,Simaria A S.A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations[J].International Journal of Production Research,2002,40(6):1405-1420.
  • 5Simaria A S,Vilarinho P M.A genetic algorithm based approach to the mixed-model assembly line balancing problem of type Ⅱ[J].Computer & Industrial Engineering,2004,47:391-407.
  • 6Helgeson W B,Brinie D P.Assembly line balancing using the ranked positional weight technique[J].Journal of Industrial Engineering,1961,12:394-398.

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部