以活动为中心的软件过程模型的改进研究 被引量:2

Research on Activity-centered Software Process Model
下载PDF
导出
摘要 用以活动为中心的过程模型进行软件开发时,良好的设计和规划活动是过程能否被有效的管理和控制的基础.首先按生命周期进行阶段划分,明确活动集合总目标;然后把各阶段分解成若干具有单个交付物属性的活动,从而限定活动大小和范围;最后利用ECA规则确定活动间顺序关系的方法,给出了一个活动粒度适宜、易于理解、实施的改进过程模型.同时还进一步讨论了该过程模型进化的策略和步骤.结果表明,这一模型将复杂的开发过程明确化、简易化、顺序化,能够明显的节约开发时间,满足小型单位对开发过程控制的需要. Proper design of activity is very important for the activity-centered software process modeling. Three steps were used to improve the controlling trouble of the size of activity's granularity. Firstly, the whole process was divided into several activity phase for the common aim. Secondly, phases were decompounded to activities which have consequential attribute. The attribute reveal each activities' scope. Finally,activities" sequences were lined out by ECA-rule. So a mended model,in which activity is more comprehended and carried into execution, is given here. At the end of this paper, some strategies and a way of evolution were also presented. It has been proved that this model is proved to make the complex process become clarity, and save the time and satisfy the requirements of small size users.
作者 荆心 雷聚超
出处 《西安工业学院学报》 2006年第3期246-249,共4页 Journal of Xi'an Institute of Technology
关键词 软件过程模型 活动 阶段 ECA规则 software process model activity phase ECA-rule
  • 相关文献

参考文献8

二级参考文献32

  • 1张颖,施海虎,柳军飞.一种以活动为中心的软件过程元模型[J].计算机工程与设计,2004,25(4):612-615. 被引量:5
  • 2柳军飞,唐稚松.软件过程建模语言研究[J].软件学报,1996,7(8):449-457. 被引量:19
  • 3李健,邵维忠,杨芙清.软件过程建模方法分类概述[J].计算机应用与软件,1996,13(2):1-8. 被引量:12
  • 4WattsS Humphrey.个体软件开发过程[M].人民邮电出版社,2001..
  • 5WattsS Humphrey.小组软件开发过程[M].人民邮电出版社,2001..
  • 6[6]Xavier Franch,Josep M Ribo.Some reflexions in the modeling of software process.procs [R].Francia: International Process Technology Workshop,1999.
  • 7[7]Josep M Ribo1,Xavier Franch.Promenade: A PML intended to enhance standarization,expressiveness and modularity in software process modelling[R].Spain:Universitat de Lleida,Lleida,Universitat Politecnica de Catalunya (UPC),2000.
  • 8[8]Xavier Franch,Josep M Ribo.Promenade: A modular approach to software process modelling and enaction[R].Spain:Universitat Politecnica de Catalunya (UPC),1999.
  • 9[9]Eshuis R.Semantics and verification of UML activity diagrams for workflow modelling[D].Stellingen:University of Twente,2002.
  • 10[10]Eshuis R,Wieringa R.An execution algorithm for UML activity graphs[Z].Lecture Notes in Computer Science 2185,Springer,2001.47-61.

共引文献19

同被引文献11

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部