结合上海市杨高中路电力隧道8号基坑工程,针对该工程周边环境差、地下管线错综复杂的特点,给出了基坑施工设计方案,并通过对整个施工过程的监测数据分析,证明该施工方案完全满足设计要求。
Combined with 8# foundation pit work in one tunnel work in Shanghai, according to the characteristics of worse surrounding envi- ronmental conditions and complicated layout of buried pipeline practical design and construction scheme is introduced. Analysis of monitoring data shows construction completely meet requirements of design.
出处
《山西建筑》
2006年第15期70-71,共2页
Shanxi Architecture
关键词
基坑开挖
支护结构
降水
foundation pit excavation, supporting structure, dewatering