摘要
雪峰山隧道施工后,对地下水进行了实时监测,并分析了雪峰山隧道涌水的基本情况,推导出三棱柱涌水模型,并加以验证,说明该模型的实用价值。
Real-time monitor is made to the groundwater with the completion of Xuefeng Mountain Tunnel. Inflowing model of triangular prism is reducted and tested to show its practice value.
出处
《探矿工程(岩土钻掘工程)》
2006年第7期62-63,共2页
Exploration Engineering:Rock & Soil Drilling and Tunneling
基金
交通部西部交通建设科技资助项目(编号:200331879802)
关键词
雪峰山隧道
地下水
三棱柱涌水模型
Xuefeng Mountain Tunnel
groundwater
inflowing model of triangular prism