摘要
地下水压力过大引起房屋地下室底板钢筋混凝土开裂,甚至被破坏,文章介绍采用钻孔桩加固技术进行结构处理,并新作防水层防水。
The larger ground - woter pressure bring up the building basement motherboard's reinforced concrete crazing, even to be deseroied, article introducing to using the reinforce technology of the drilling peg, in order to deal with the building's configuration problem, equally renewedly make the waterproof floor,
出处
《基建优化》
2006年第2期125-126,共2页
Optimization of Capital Construction
关键词
水压作用
地下室底板
开裂原因
结构处理
Hydraulic pressure action basement motherboard crazing reason configuration disposal