网络计划技术的计算机处理算法分析 被引量:1

Algorithm Analysis About Computer Processing of the Network Plan Technique
下载PDF
导出
摘要 网络计划技术在科研生产、基本建设、综合计划等许多领域有广泛的应用。在大型集团公司的新品开发研制计划中可采用此项技术,利用计算机管理程序,计算各道工序的平均完成时间,最早完成时间,最迟结束时间,延迟时间,分布函数概率,并寻找出整个工程的关键路线,同时在计划实施过程中,根据实际进度找出整体项目的“瓶颈”工程,可以有效地管理和调度时间、人力、材料及设备,合理进行资源配置,收到较大的效益。 The network plan technique is applied extensively to such fields as scientific research and production, capital construction, comprehensive plan etc. In the plan of new products opend up and developed for large group companies, this technique can be adopted in making use of the computer management programme, calculating the average time of completion, the earliest time of completion, the time of extension and the function probability of every section and to get to the access to the key path of the whole engineering. Meanwhile in the course of plan execution, the 'bettleneck' engineering of the whole item can be found out according to the actual tempo. Thus the manager can mamage and control time, manpower, material and equipment and rationally distribute resources, in order to achieve the desired result.
作者 倪苏敏 刘萍
出处 《北京联合大学学报》 CAS 1996年第3期35-40,共6页 Journal of Beijing Union University
关键词 网络计划 计划评审技术 计算机处理 算法 network plan key path probability
  • 相关文献

同被引文献4

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部