九井岗水电站整体水工模型试验研究 被引量:2

Study on the Model Tests of Jiujinggang Hydropower Station
下载PDF
导出
摘要 九井岗水电站通过整体水工模型试验,验证水库各特征水位下溢洪道的泄流能力,校核挡墙的设计高度,分析坝体及岸坡式溢洪道产生气蚀的可能性,提出优化溢洪道进口的布置方案,并根据下游消能冲刷情况,提出对下游岸坡采取适当保护措施的建议。 This paper examines the project of the model tests, as well as its testing methods, of Jiujinggang Hydropower Station. Through these tests, the discharging ability of the spillway is computed. The wall height of the overflow groove is validated, and the probability of cavitation erosion is also analyzed. An optimized arrangement project of the spillway and suggestions of structural measures to the riversides are proposed. This paper may present as a reference in other engineering designs and model tests as well.
出处 《水力发电》 北大核心 2006年第7期87-89,共3页 Water Power
基金 浙江省自然科学基金资助项目(Y504228)
关键词 水工模型试验 泄流能力 冲刷 九井岗水电站 hydraulic model test discharging ability impact erosion Jiujinggang Hydropower Station
  • 相关文献

参考文献2

二级参考文献4

  • 1Pjnto N L.射流通气量的模拟[A]..见:国际水工模拟缩尺影响专题讨论会译文选集[C].长江科学院,1985.112一116.
  • 2Pinto N L.溢洪道掺气水流模型——原型的相似性[A].见:高速水流情报网编译.国际水工模型试验会议译文选集[C].长江科学院,1984.128—132.
  • 3杨顺玉.弧门后突扩跌坎通气设施的空化特性[J].泄水工程与高速水流,1992,(2):14-14.
  • 4周赤,韩继斌,朱世洪,何勇.三峡工程泄洪深孔跌坎掺气体型模型试验研究[J].长江科学院院报,2000,17(5):5-8. 被引量:10

共引文献9

同被引文献30

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部