摘要 分析了宝鸡第二发电厂原有600m3/h机械搅拌澄清池存在的问题,结合利用循环水排水,提出了澄清池的改造方案:(1)加装斜管;(2)改变助凝剂加药点;(3)加酸控制;(4)调整、修复集泥装置和取样点。改造后的运行试验表明,澄清池出水水质优良,改造获得成功。 The existing problems of original 600 m3/h mechanically agitated settling pond in Baoji Power Plant no. 2 have been analysed, and the retrofitting scheme of the settling pond being put forward. Combined with utilization of discharged water of the circulating water, the said scheme includes: (1) aditionally to install inclined pipe; (2)to change the dosing point of coagulant aid; (3)to control the acid dosing; (4) to adjust and repair the mud collector and the sampling points. After retrofitting, the operation test shows that the quality of output water from the settling pond to be excellent, obtaining great success.
出处 《热力发电》 CAS 北大核心 2006年第7期66-67,71,共3页 Thermal Power Generation
关键词 发电厂 澄清池 循环水 水源 水质 power plant settling pond circulating water mud in water water quality
  • 相关文献

参考文献4

  • 1DL/T 5068—1996,火力发电厂化学设计技术规定[S].
  • 2电力工业部西安热工研究所.低温低浊水除浊工艺的研究[R].1992.
  • 3许建学,等.彭城电厂二期工程反渗透预处理系统可行性研究试验报告[R].国电热工研究院,1998.
  • 4许建学,等.宝鸡第二发电厂机械搅拌澄清池改造项目试验报告[R].西安热工研究院有限公司,2005.