从高速铁路补充定额入手,结合案例分析研究了简支箱梁架设进度、供应范围、加快架设进度的措施,为设计阶段高速铁路简支箱梁工期的确定分析提供一种思路。
Based on the additional norms for high speed railways and combined with case study, this article analyzes and studies the erection progress, scope of supplies, and measures of expediting the erection progress of simple box girders, which provides a concept for determination, analysis and study of the construction time for simple box girders on high speed railways in the design phase.
出处
《铁路工程造价管理》
2006年第4期13-16,共4页
Railway Engineering Cost Management
关键词
高速铁路
简支箱梁
工期研究
High speed railway, simple box girder, study of construction time