西北750 kV示范工程光缆架设施工总结 被引量:1

Summary of optical cable construction in Northwest China 750 kV transmission line
下载PDF
导出
摘要 根据官亭变—兰州东变750 kV输电线路示范工程的要求和线路条件,文章主要论述了此次工程的全部工艺流程及技术、安全操作要点。重点介绍了该工程的施工流程、器具的选择及施工中各个操作要点的安装步骤,详细探讨了各个施工过程的注意事项和工艺要求。总结该工程的操作经验,具有很强的实际意义,同时给相关人员提供了很好的借鉴作用。 Based on engineering requirement and line condition of Guanting to Lanzhou East 750 kV transmission line, this paper mostly describes the complete technological process flow of optical cable construction applied in this demonstration project including the key points for operation of techniques and safety. It introduces the construction flow, the choice of instrument and installation steps on each operation point. It also discusses points for attention and technological requirements. The summarized operational experience has highly practical significance and provides good reference effect.
机构地区 甘肃送变电公司
出处 《电力系统通信》 2006年第8期20-25,28,共7页 Telecommunications for Electric Power System
关键词 750 KV OPGW 光缆 施工 750 kV OPGW optical cable construction
  • 相关文献

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部