摘要
根据设计及规范要求,结合场地的地质条件与环境条件,采取合理的倾斜度控制及防塌孔措施,确保在复杂地质条件下钻孔灌注斜桩施工取得成功。
Combined with geological and environmental condition of the ground, the author adopts reasonable gradient control and anti-collapse holes measure in construction according to design and code requirement, in order to ensure the success of bored cast-in-situ battered pile construction in complex geological condition.
出处
《山西建筑》
2006年第16期78-79,共2页
Shanxi Architecture
关键词
钻孔灌注斜桩
复杂地质
倾斜度控制
bored cast-in-situ battered pile, complex geological condition, control of gradient