摘要
对高速公路桥头跳车病害的原因进行了系统分析,介绍了在公路建设阶段处理桥头跳车病害的措施,改善行车条件,促进经济发展,为工程实际应用提供参考。
The reasons caused the vehicle jolting at bridgehead are systematically analyzed; at the same time corresponding treatment measures in construction stage are proposed in order to provide references for practical works.
出处
《山西建筑》
2006年第16期253-254,共2页
Shanxi Architecture
关键词
桥头跳车
路基沉降
台背回填
vehicle jolting at bridgehead, roadbed subsidence, back filling behind abutment