摘要
结合白水湘江大桥具体概况,从人造覆盖层的制作、钢护筒的制作与就位、施工平台的搭设、钻孔等方面介绍了主桥2号墩桩基施工方法,实践证明,其具有实用推广意义。
Combined with general condition of Baishuixiangiiang bridge, the author introduces its pile foundation construction method of main bridge 2 # pier from making of artificial overlay, making and installation of steel pile casing, establishing construction platform and drilling hole, which to show its popularizing meaning.
出处
《山西建筑》
2006年第16期284-285,共2页
Shanxi Architecture
关键词
桩基施工
钢护筒制作
施工平台
钻孔
pile foundation construction, steel pile casing making, construction platform, drilling hole