摘要
针对陕西集华柴家沟煤矿综放工作面现状,对其进行优化设计,使综放工作面设计更加适合该矿开采条件,更好地发挥综放开采的优越性,最大限度地回收煤炭资源。
Aimed at the status-quo of full-mechanized caving mining face in Chaijiagou Colliery, optimization design is made to make it more suitable for the mining conditions of this colliery, exert better the advantage of full-mechanized caving mining and recover coal resource furthest.
出处
《煤矿开采》
2006年第4期30-31,36,共3页
Coal Mining Technology
关键词
综放工作面
优化设计
走向长度
工作面长度
full-mechanized caving mining face
optimization design
strike length
face length