介绍在引水隧洞黄泥夹石段不良地质情况时,采用小钢管和自进式锚杆进行超前支护的设计和施工方法,在施工工艺、参数和施工过程进行了具体介绍。
This paper introduces crafts and methods of construction, parameters and construction procedure, using design and construction of steel pipes and automatic anchor pole to pre-support, under the bad geology Condition in the segment of the tunnel with sandwich.
出处
《吉林水利》
2006年第8期30-31,共2页
Jilin Water Resources
关键词
水工隧洞
黄泥夹石地质段
超前支护
超前小钢管
自进式锚杆
hydraulic tunnel
geology segment with sandwich
pre-support
steel pipe
automatic anchor pole