隧道超欠挖对隧道成本的影响及控制途径 被引量:16

Impact of Overbreak/shortbreak on Tunnel Construction Cost and Their Control Approaches
下载PDF
导出
摘要 阐述了钻爆法隧道开挖时超欠挖产生的原因,分析了超欠挖对隧道施工成本的提高产生的重要影响,以此期望能够引起足够重视。最后提出控制隧道超欠挖的三条主要途径:①强化现场施工管理,这是减少超欠挖的根本措施;②实施“新奥法”技术,这是减少超、欠挖的有效技术措施;③改变“宁超勿欠”的传统观点,树立“少超少欠”的观点。 The article expatiates on the causes for the overbreak/shortbreak in the drill + blast tunneling and analyzes on the impact of the overbreak/shortbreak on the increase of the tunnel construction cost. Finally, the article recommends three main approaches for the control of the overbreak/shortbreak during tunneling, i.e. , ① strengthening the site construction management, which is the fundamental approach to reduce the overbreak/shortbreak ; ② fulfilling NATM technology, which is the effective technical approach to reduce the overbreak/shortbreak; ③ replacing the traditional viewpoint of "overbreak rather than shortbreak" by the viewpoint of "less overbreak and less shortbreak".
作者 王承山
出处 《隧道建设》 2006年第4期13-15,共3页 Tunnel Construction
关键词 隧道 超欠挖 成本 控制途径 tunnel overbreak/shortbreak construction cost control approach
  • 相关文献

同被引文献78

引证文献16

二级引证文献77

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部