期刊文献+

湿法冶金提钒浸出新工艺 被引量:18

A STUDY OF A NEW TECHNOLOGY F LEACHING OF VANADIUM FROM VANADIUM ORES WITH HYDROMETALLURGY
下载PDF
导出
摘要 对湖南某钒矿进行室内浸出试验,确定了该矿石经预处理后,矿石浸出率大为提高,浸出时间也缩短,同时也确定了浸出率与浸出时间、温度、液固比、预处理温度、预处理时间等的关系。试验结果表明,矿石经预处理、添加助浸剂后,浸出率由原来的50%提高到87%左右,浸出时间也由原来的20小时缩短为15小时。 Carry on to some mineral of vanadium in Hunan indoor leaching to experiment, make sure the mineral' s stone after prepare the processing, leaching a rate greatly for exaltation, leaching a time to also shorten, made sure to leach a rate to leach a time, temperature at the same time, the liquid is solid than, prepare to handle the temperature, prepare to handle time etc. relate to , experimenting the result make known: The mineral' s stone is after prepare the processing and add to helpful-preparation leaching a rate from originally 50^ raises to 87 % or so, leaching a time to also shorten to 15 hours from original 20 hours
机构地区 南华大学
出处 《中国矿业》 北大核心 2006年第7期64-66,共3页 China Mining Magazine
关键词 钒矿石 预处理 助浸剂 Vanadium mine Prepare the processing Helpful-preparation
  • 相关文献

参考文献5

二级参考文献17

  • 1顾坚.石煤的综合利用和石煤提钒[J].能源政策研究通讯,1989(3):32-36. 被引量:6
  • 2蔡晋强,巴陵.石煤提钒的几种新工艺[J].矿产保护与利用,1993,13(5):30-33. 被引量:21
  • 3《有色金属提取冶金手册》编委会.有色金属提取冶金手册.稀有高熔点金属(下)[M].北京:冶金工业出版社,1999.326-331.
  • 4艾同娟.金属化学分析技术指南[M].贵州:贵州人民出版社,1988.11,302-305.
  • 5Allen J. Bard. Encyclopedia of Electrochemistry of the Elements ( Ⅶ ) [M]. New York : Marcei Dekker Inc, 1976:307.
  • 6梅里特RC.铀的提取冶金学[M].北京:科学出版社,1978.149.
  • 7Godard J B.Salt Roasting of Vanadium Ores[C].Extr Metall Met Proc Symp.1981.127-45.
  • 8Brooks P T, Pottr G M.Recovering Vanadium from Dolomitic Nerada,MBRI7932,1974.20.
  • 9煤碳部综合利用和科技情报石煤湖南分站 湖南石煤综合利用研究所.曼斯菲尔德碳质页岩的开采与加工[J].石煤科技,1979,(3):5-10.
  • 10浙江省煤碳工业局.石煤的综合利用[M].北京:煤碳工业出版社.1980.

共引文献225

同被引文献129

引证文献18

二级引证文献129

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部