摘要
本文介绍了广东粤电长湖发电厂200t+50t桥式起重机电气系统改造过程中,电动机与变频器选型的关键技术问题。经实践运行表明,系统是稳定可靠。
This paper describes how to select the motor and simovert during the electric system improvment of bridge crane of Chanhu power plant. The practice application shows that the system is steady.
出处
《变频器世界》
2006年第7期90-92,共3页
The World of Inverters