摘要
研究了按单定制供应链(BOSC)中如何解决低库存和高响应速度之间的矛盾问题,根据已有文献总结了BOSC中的管理方法。最后,针对以往相关文献中缺少BOSC实施案例的情况,详细介绍了Dell公司成功实施BOSC的具体案例。
In this paper, the author studies how to solve the contradiction of keeping low inventory and high speed of response in Build-to-order supply chain ( BOSC), summarizes the management method in BOSC on the basis of the literatures before. At last, since there is lack of research on the implementation of BOSC, the author introduces the successful building of BOSC in Dell.
出处
《软科学》
CSSCI
2006年第4期127-130,共4页
Soft Science
基金
国家自然科学基金重点项目(70432001)