摘要
通过介绍目前铁路集装箱中心站常规设计模式和集装箱装卸机械,分析了当装卸线采用移动接触网时影响线间距的主要因素,同时给定了线间距为6.5m时集装箱装卸机械横向操控最大允许误差并对运营管理提出建议。
By introducing routine design mode and railway network container loading & unloading mechanism of railway network container freight station today, analyses the main factors that influence track spacing when movable overhead contact system is applied on loading & unloading track. At the same time, produces the transverse operation maximum allowable error of railway network container loading & unloading mechanism when the tracks spacing is a destined value, that is 6.5 m, and puts forward some suggestions on operation and management.
出处
《电气化铁道》
2006年第4期21-23,共3页
Electric Railway