摘要
蚌埠天奥大厦二期工程地下室筏形底板大体积混凝土冬期施工中,通过采取增加膨胀加强带、内掺抗渗防冻高效减水剂、掺加粉煤灰、分层浇筑混凝土等措施,降低水化热和改善和易性,达到抗裂防渗的效果,有效保证了混凝土的施工质量。
During the construction of the bottom raft mass concrete of the basement in winter of Spaccon Mansion (Stage Ⅱ ) in Bengbu City, the hydration heat of cement is reduced, the workability is improved, the impervious and frost-preventing results are achieved, and the concrete construction quality is effectively ensured by adding the reinforcing band, adding impervious and frost-preventing water reducing agent, adding flyash and concreting in lifts.
出处
《安徽建筑》
2006年第4期57-58,共2页
Anhui Architecture
关键词
大体积混凝土
冬期施工
养护
mass concrete
construction in winter, maintenance