资源受限项目调度中缓冲区的设定方法 被引量:70

Approach for setting time buffers in resources-constrained project scheduling
下载PDF
导出
摘要 基于资源受限项目调度(RCPS)的理论与方法,设计了一种项目计划中非关键链上工作缓冲区的设定方法.该方法综合考虑了工作在资源约束下的自由时间和根据根方差法计算的输入缓冲区的尺寸,分别针对每项非关键链上的工作设置时间缓冲区,既起到了保护关键链工作按计划执行的作用,又降低了项目净成本,同时避免了简单关键链管理方法因缓冲区设置而产生的工作间资源冲突.文中通过对资源受限项目调度问题(RCPSP)的标准问题库PSPLIB中典型案例的求解过程对算法的应用过程进行了描述. Based on resources-constrained project scheduling (RCPS) theory and methods, we develop a new approach for setting project buffer and feeding buffers. This approach synthetically takes resourceconstrained float time of activity and feeding buffer sizes calculated with root square error method into consideration when assigning time buffers. The time buffers assigned through this approach can protect the activities start time in critical chain, reduce project present cost, and avoid resources conflict among activities produced by setting buffers according to simple critical chain management method. Standard instance from PSPLIB is cited to illustrate the solving process of our approach.
出处 《系统工程学报》 CSCD 北大核心 2006年第4期381-386,共6页 Journal of Systems Engineering
基金 国家自然科学基金资助项目(703010077043100370471028) 辽宁省博士启动基金资助项目(20021011)
关键词 项目管理 计划与调度 关键链 缓冲区设置 project management planning and scheduling critical chain setting buffers
  • 相关文献

参考文献18

  • 1Goldratt E M.Critical Chain[M].Great Barrington:The North River Press,1997.
  • 2刘士新,宋健海,唐加福.关键链——一种项目计划与调度新方法[J].控制与决策,2003,18(5):513-516. 被引量:55
  • 3Hagemann A G.Use of the Critical Chain Project Management Technique at NASA,Langley Research Center[C].AIAA/IEEE Digital Avionics Systems Conference-Proceedings,2001,Oct,14-18:4B11-4B110.
  • 4Rand G K.Critical chain:The theory of constraints applied to project management[J].International Journal of Project Management,2000,18:173-177.
  • 5Steyn H.An investigation into the fundamentals of critical chain project scheduling[J].International Journal of Project Management 2000,19:363-369.
  • 6Herroelen W,Leus R.On the merits and pitfalls of critical chain scheduling[J].Journal of Operations Management,2001,19:559-577.
  • 7Wei C,Liu P,Tsai Y.Resource-constrained project management using enhanced theory of constraint[J].International Journal of Project Management,2002,20:561-567.
  • 8Yeo K T,Ning J H.Integrating supply chain and critical chain concepts in engineer-procure-construct (EPC) projects[J].International Journal of Project Management,2002,20:253 -262.
  • 9刘士新,王梦光,唐加福.资源受限工程调度问题的优化方法综述[J].控制与决策,2001,16(B11):647-651. 被引量:23
  • 10Brucker P,Drexl A,Mohring R,et al.Resource-constrained project scheduling:Notation,classification,models,and methods[J].European Journal of Operational Research,1999,112:3-41.

二级参考文献13

  • 1Goldratt E M, Cox J. The Goal E M1. 2nd ED.Aldershot :Gower, 1993.
  • 2Goldratt E M. It's Not Luck[M]. Aldershot: Cower,1994.
  • 3Goldratt E M. Critical Chain [M]. MA.. The North River Press, 1997.
  • 4Rand G K. Critical chain: The theory of constraints applied to project management [J]. Int J of Project Management, 2000, 18(3): 173-177.
  • 5Steyn H. An investigation into the fundamentals of critical chain project scheduling [J]. Int J of Project Management, 2000, 19(6). 363-369.
  • 6Herroelen W, Leus R. On the merits and pitfalls of critical chain scheduling[J]. J of Operations Management, 2001, 19(5): 559-775.
  • 7Wei C C, Liu P H, Tsai Y C. Resource-constrained project management using enhanced theory of constraint[J]. Int J of Project Management, 2002,20(7) : 561-567.
  • 8Yeo K T, Ning J H. Integrating supply chain and critical chain concepts in engineer-procure-construct(EPC) projects [J]. Int J of Project Management,2002, 20(4): 253-262.
  • 9Brucker P, Drexl A, Mohring R,et al. Resource-constrained project scheduling: Notation, classifi-cation,models, and methods[J]. European J of Operational Research, 1999, 112(1):3-41.
  • 10谈烨,仲伟俊,徐南荣.多种资源在多项目间分配的两层决策方法[J].系统工程学报,1999,14(3):290-295. 被引量:10

共引文献76

同被引文献720

引证文献70

二级引证文献436

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部