摘要
介绍了八仙岩隧道现场监控量测方法,分析了八仙岩隧道各种结构型式地段典型断面施工中的围岩稳定性,对围岩变形和应力的分布特征进行了探讨.
A supervising and measuring method in construction of Baxian Rock Tunnel is introduced, the wall rock stability of type break face in configuration terra is analyzed and the wall rock transfiguration and stress distribution.
出处
《重庆交通学院学报》
2006年第B06期40-43,共4页
Journal of Chongqing Jiaotong University
关键词
监控量测
围岩
分析
supervise measure
wall rock
analysis