期刊文献+

回采巷道外错布置的理论与实践 被引量:18

The Theory and Practice of Outward Staggered Entries Arranging in Stoping
下载PDF
导出
摘要 通过综合分析煤柱应力分布和破坏情况,探讨了回采巷道外错布置时巷道位置的选择原理;运用岩体极限平衡理论和逐步破坏理论,建立了上分层煤柱塑性区宽度计算方法,在此基础上提出了上分层煤柱最优宽度应大于2倍破裂区宽度且小于2倍塑性区宽度的结论;在上分层煤柱尺寸优化设计之后,下分层巷道外错距离可由上分层煤柱尺寸及其破裂区宽度加以确定。上述理论在潞安矿业集团五阳矿,应用效果良好。 Based on the theory of rock mass limit balance and progressive damage theory, the way of extent calculating for plastic zone of higher slice pillar is given, and the conclusion that optimum width of higher slice pillar is greater than 2 times of size of pillar broken zone and smaller than 2 times of size of pillar plastic area is obtained. After the size of higher slice pillar is designed optimally, the outward staggering measurements of lower slice roadway can be determined by the size of higher slice pillar and its damage extent. And, an applying example of above researches is given.
出处 《太原理工大学学报》 CAS 北大核心 2006年第4期420-422,433,共4页 Journal of Taiyuan University of Technology
基金 外错式巷道组岩稳定性评判与控制技术研究(五阳2004-01)
关键词 分层开采 回采巷道 煤柱 外错布置 slicing actual mining roadway coal pillar outward staggered arrangement
  • 相关文献

参考文献1

二级参考文献1

  • 1董玉文.国外厚煤层顶煤冒落综采法的发展及其在我国推广应用的前景[Z].北京:煤炭工业部机械制造局科技情报中心站,1983..

共引文献2

同被引文献106

引证文献18

二级引证文献126

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部