期刊文献+

基于分类指标体系的造船供应商模糊评价模式

下载PDF
导出
摘要 现阶段我国船厂的供货形势恶劣,选择合适的供应商至关重要。针对以往的文献采用单指标体系难以做出全面的判断,本文提出了分类指标体系,对不同类型的供应商使用不同的指标体系,再通过模糊评价模式,即可有效地对船厂各类型供应商作出抉择。
机构地区 江苏科技大学
出处 《造船技术》 北大核心 2006年第4期9-12,4,共5页
  • 相关文献

参考文献2

二级参考文献14

  • 1Ram Ganeshan,Terry P. Harrison. An introduction to supply chain management, http://silmaril, smeal, psu. edu/misc/supply chain intro. html.
  • 2M Fleiseher,R Kohler, T Lamb, H B Bongiorni, N Tupper.Shipbuilding supply chain integration project -Interim rept. Environmental Research Inst of Michigan, Ann Arbor Nov. 1998 http://www.ntis.gov/seareh/results. asp? loc= 3-0-0.
  • 3SANTER J A, PARUNAK H V D, BRUECKNER S. Agent-based modeling and control of marine supply chains[J].Journal of Ship Production, 2001, 17(4): 218-225.
  • 4HOLT G D, OLOMOLAIYE P O, HARRIS F C. Evaluating prequalification criteria in contractor selection[J]. Building and Environment, 1994, 29(4): 437-448.
  • 5HOLT G D, JENINGS P. Prequalification and multi-criteria selection: a measure contractor's opinion [J]. Construction Management and Economics, 1998,16(6):651-660.
  • 6NG S T, SKITMORE R M. Client and consultant perspectives of prequalification criteria [J]. Building and Environment,1999, 34(5) :607-621.
  • 7PALANEESWARAN E, KUMARASWAMY M. Recent advances and proposed improvements in contractor prequalification methodologies[J]. Building and Environment, 2001, 36(1) :73-87.
  • 8BOER L d, LABRO E, MORLACCHI P. A review of methods supporting supplier selection[J]. European Journal of Purchasing & Supply Management,2001,7(2) :75-89.
  • 9BARBAROSOGLU G, YAZGAC T. An application of the analytic hierarchy process to the supplier selection prohlem[J].Journal of Production and Inventory Management, 1997, 38(1):14-21.
  • 10NYDICK R L, HILL R P. Using the analytic hierarchy process to structure the supplier selection procedure[J]. International Journal of Purchasing and Materials Management,1992,28(2):31--36.

共引文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部