以某水电站右出口明渠土质变形体为例,介绍应用轻型井点降水措施与其它配套措施一起实施,在其抗滑治理中取得成功,可为其它类似工程提供借鉴。
Stablization of the deformable soil mass in a hydroelectric station is taken as an example to illustrate the successful application of light well point system for slide prevention.
出处
《土工基础》
2006年第4期6-8,共3页
Soil Engineering and Foundation
关键词
轻型井点降水
土质变形体
抗滑治理
light wellpoint dewatering, soil mass deformation, slide prevention