通过对南水北调隧道工程的主要施工风险的分析,对施工中可能遇到的风险进行了预测分析,并介绍了针对性的预备措施和重点应急方案,给今后类似工程的风险评估与对策提供了借鉴,具有很高的指导性意义。
Based upon analysis of construction risk existed in tunnel works in water transfer project from south to north the risks maybe encountered in construction are forecasted; at the same time corresponding preparatory measures and emergency plan are introduced, which provide references for risk assessment of similar works in the future with high instruction value.