期刊文献+

地铁一号线徐家汇站穿越施工影响的数值分析 被引量:2

Numerical Analysis of Crossing Construction Effect in Xujiahui Station of No.1 Subway
下载PDF
导出
摘要 以上海轨道交通九号线徐家汇站工程的实际施工为背景,对徐家汇站中央换乘大厅改建施工、轨道交通九号线对一号线徐家汇站穿越段施工进行三维有限元分析,模拟了施工过程对地铁一号线的影响。得出了一些规律性的认识和有价值的结论,给施工提出了一些有益的建议。 Taking the practical construction in Xujiahui station project of No. 9 Shanghai track traffic as a background, the 3D FEM analysis of the rebuilding construction in Central Change Concourse of Xujiahui station and the construction of crossing section from No. 9 track traffic to Xujiahui station of No. 1 subway is carried out; the influence of construction process on No. 1 subway is simulated. Some law knowledges and conclusions of value are obtained, and some profitable suggestions are put forward for construction.
机构地区 同济大学地下系
出处 《西部探矿工程》 CAS 2006年第5期118-119,121,共3页 West-China Exploration Engineering
关键词 地铁 穿越车站 三维有限元 subway crossing station 3D FEM
  • 相关文献

参考文献3

  • 1王瑁成 邵敏.有限单元法基本原理和数值方法[M].北京:清华大学出版社,1996..
  • 2朱伯芳.有限单元法原理和应用[M].北京:中国水利水电出版社,1998..
  • 3ANSYS分析指南[E].ANSYS北京办事处,1999.

共引文献6

同被引文献10

引证文献2

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部