摘要
世界之窗站是深圳地铁一期工程的关键工程,该车站范围内地下水丰富。介绍了该车站基坑降水井设计、布置、施工方法及降水施工监控。
Window on the World station is the key project of the first phase of Shenzhen subway. The scope of this station is rich in groundwater resources. This paper introduces the foundation pit water level lowering well's design, arrangement, construction methods and water level lowering construction monitoring.
出处
《西部探矿工程》
CAS
2006年第10期171-172,共2页
West-China Exploration Engineering
关键词
地铁
施工
降水井
监控
subway
construction
water level lowering well
monitoring