期刊文献+

彭水水电站上下游土石围堰防渗施工技术 被引量:1

Technique for anti-seepage construction of earth-rockill cofferdams of Pengshui Hydropower Station
下载PDF
导出
摘要 彭水水电站上下游围堰地质条件复杂,大块石架空严重,在前期采用了高喷灌浆、塑性灌浆、双液控制性灌浆、砂浆灌注等多种灌注工艺处理,灌浆效果不明显,后采用速凝膏浆结合水泥补强灌浆工艺,基坑抽水表明防渗效果良好,为类似大架空地层防渗施工提供了一种新的处理技术。 For both the upstream and downstream earth-rockfill cofferdams for construction of Pengshui Hydropower Station, the geological condition is complicated with a stratum consisting of large rubbles hollowly-deposited seriously therein. Under this condition, the anti-seepage measures such as jet grouting, plastic grouting, double-shut grouting, mortar grouting, etc. are adopted during the fore-phase of the construction, but the grouting effect is not so significant. Consequently, a new technology combined with both the quick-setting slurry grouting and the cement grouting is applied, and then better anti-seepage effect is obtained, which is proved by the related test made after pumping of the foundation pit. This technology provides a new treatment technique for the anti-seepage measure to be used in the similar constructions under the condition of such a stratum.
作者 何培章
出处 《水利水电技术》 CSCD 北大核心 2006年第8期45-49,共5页 Water Resources and Hydropower Engineering
关键词 土石围堰 架空地层 大块石 防渗 速凝膏浆 彭水水电站 earth-rockfill cofferdam hollowly-deposited stratum large rubble anti-seepage quick setting slurry Pengshui Hydropower Station
  • 相关文献

同被引文献10

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部