北疆供水工程施工组织设计的几个关键技术问题 被引量:4

Key technical problems in construction organization design of North Xinjiang Water Supply Project
下载PDF
导出
摘要 北疆供水工程属大型长距离调水工程,施工组织设计较为复杂,其中软岩隧洞施工、三种倒虹吸管道施工、大型沙漠渠道施工、料场规划、土石方挖填平衡规划、施工供水等几个关键施工技术,是做好施工组织设计的重点。结合北疆供水工程的实施,浅谈对施工组织设计过程中几个关键技术问题的认识。 The North Xinjiang Water Supply Project is a large and long distance water supply project, of which the construction organization design is quite complicated. Within the construction design, the key technical points are the constructions of a tunnel in weak rock, three kinds of inverted siphons and a large channel in desert, and the plannings of both borrow area and the balance of the earth-rock excavation and fill as well as the construction water supply, etc. In conjunction with the construction of the project, the problems given above are briefly discussed herein.
作者 李江 宋国涛
出处 《水利水电技术》 CSCD 北大核心 2006年第8期50-54,共5页 Water Resources and Hydropower Engineering
关键词 供水工程 施工组织设计 关键技术 北疆供水工程 water supplying project construction organization design key technical North Xinjiang Water Supply Project
  • 相关文献

同被引文献30

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部