2Chao Chen. Freeway performance measurement system[R]. California Path Program, Institute of Transportation Studies, University of California, Berkeley, 2003.
3崔红军.大型活动交通组织管理关键技术研究[D].南京:东南大学,2006.
4美国交通研究委员会.道路通行能力手册[R].任福田,译.北京:中国建筑工业出版社,1991.
5Transportation Research Board, National Research Council. Highway capacity manual. Special report209, Chapter 9 : Signalized intersections (Third Edition) [R]. Washington, D. C. ,Transportation Research Board, National Research Council, 1994.
6Panos D. Prevedouros,Cathy A. Koga. Comparison of 1985 and 1994 HCM: signalized interseetion delay estimates[J].Ite Journal, 1996 (6).
7Yoassary M. Elzohairy,Rahim F. Benekohal. Comparison of the 1994 and the 1997 HCM delay models for pretimed undersaturated intersections[A]. Presented at the 79th Annual Meeting of TRB, Washington, D.C. , 2000.