期刊文献+

应用模糊数学评价麻栗坝工程建设的必要性 被引量:1

Assessment of Necessity of Construction of Maliba Reservoir Project by Using Fuzzy Mathematical Method
下载PDF
导出
摘要 将模糊数学的基本原理引入到麻栗坝水库工程公众参与影响评价中。通过建立模糊综合评判模型对工程的建设进行定量评价,结果表明:水库工程建成后能改善灌区的供水条件,促进当地社会经济发展,综合效益显著。因此,麻栗坝水库工程的建设是十分必要的。 The elementary principles of fuzzy mathematics were introduced in the impacts assessment of the Maliba reservoir project with public participation. The quantitive assessment of the Maliba reservoir project through a fussy mathematical model for overall assessment was made and the result indicated that the reservoir project will improve the water supply conditions for the irrigation area, boost the local social economic development with a prominent overall benefit. Therefore the conclusion is that the construction of the Maliba reservoir project proves extremely necessary.
出处 《水力发电》 北大核心 2006年第8期79-80,88,共3页 Water Power
关键词 模糊综合评判 公众参与 影响评价 麻栗坝水库 overall assessment through fuzzy mathematical approach public participation environmental evaluation Maliba Reservoir Project
  • 相关文献

参考文献4

二级参考文献11

共引文献47

同被引文献9

引证文献1

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部