摘要
本文结合工程实例,分析了地下室混凝土墙体最大允许整浇长度与养护时间的关系,提出了避免出现地下室长墙温度变形裂缝的控制措施,可为同类工程提供参考。
In this paper, Combining with an engineering practice, the relationship between allowable length of the wall and curing time was analyzed. The measures to avoid the temperature crack formed in the long walls of underground basement was also presented, which may be useful to similar engineering.
出处
《福建建设科技》
2006年第5期25-26,共2页
Fujian Construction Science & Technology
关键词
混凝土长墙
裂缝
成因
控制措施
long wall of underground basement
cracking
cause of formation
preventive measures