期刊文献+

卧龙河气田增压南站噪声治理 被引量:1

Noise Control in the Southern Booster Station of Wolonghe Gas Field
下载PDF
导出
摘要 根据卧龙河气田增压南站周边环境状况、增压机噪声强度及频谱分析特性,结合吸音、隔音、扩容、变频、减震、阻尼等降噪原理和治理技术,提出了卧龙河增压南站噪声最优化的治理方案,即七台机组噪声综合治理方案。该方案可满足厂界噪声达到GB12348-90规定的三类标准要求,一次性投资费用为303万元,且便于压缩机日常维护及保养,并可进行机组就地大修。 On the basis of anti-noise principles and control technologies of noise, the optimum control project, the integrative control of noise from seven boosters, was proposed to reduce noise in the southern booster station of Wolonghe Gas Field according to the environmental conditions of the booster station, noise strength of booster and frequency spectrum analysis. This project has low input and good effectiveness of anti-noise. The repair and maintenance of compressors are simple and convenient on site.
作者 江丽 钟朝前
出处 《油气田环境保护》 CAS 2006年第3期21-24,共4页 Environmental Protection of Oil & Gas Fields
关键词 卧龙河气田 增压站 噪声治理 设计方案 Wolonghe Gas Field booster station noise control design project
  • 相关文献

参考文献6

  • 1GBJ87—85《工业企业噪声控制设计规范》
  • 2卫生部及国家劳动总局颁布的《工业企业噪声卫生标准》
  • 3B12348—90《工业企业厂界噪声标准》
  • 4GB12349—90《工业企业厂界噪声测量方法》
  • 5GB50058—92《爆炸和火灾危险环境电力装置设计规范》
  • 6GB3836.1-2000《爆炸性环境用防爆电气设备通用要求》

共引文献2

同被引文献3

引证文献1

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部