基于时域的汽轮发电机暂态仿真 被引量:2

Transient Simulation of Steam-turbine Generator Based on Timedomain
下载PDF
导出
摘要 结合大型火电厂实时仿真机对汽轮发电机高逼真度仿真的要求,通过Park方程建立能精确描述其暂态过程的状态方程,并对时变的系统矩阵A和控制矩阵B进行改进处理,结合四阶Runge-Kutta法得到更省计算量的数值解法.最后编写相应的仿真程序,对某360 MW汽轮发电机进行突加负载仿真试验,仿真结果显示文中提出的方法适合实时仿真机的发电机模型. For achieving the high-fidelity simulation of steam-turbine generator on the real-time simulator of coal fired plant, the paper establishs a group of state equations based on Parkg equation, which can accurately describe its transient process. Then a kind of time-saved numerical solution in terms of four-order Runge-Kutta method is proposed through the modified processing to the time-dependent system matrix A and control matrix B. Finally a program is coded to simulate the emergency load process of one 360MW steam-turbine generator, the result indicates that the method of this paper can exactly apply on the generator model of real-time simulator.
出处 《重庆大学学报(自然科学版)》 EI CAS CSCD 北大核心 2006年第8期53-56,共4页 Journal of Chongqing University
关键词 Park方程 暂态过程 状态方程 四阶Runge—Kutta法 突加负载 park g equation transient process state equation four-order runge-kutta method emergency load
  • 相关文献

参考文献6

共引文献38

同被引文献6

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部