期刊文献+

新型蒸汽发生器泄漏监测装置的研制 被引量:4

The development of a new steam generator leak monitoring system
下载PDF
导出
摘要 本装置的工作原理是基于堆芯中子与冷却剂中轻水或重水中的氧同位素16O1、8O核反应时,其放射性产物16N1、9O的半衰期各不相同,由于16N和19O从堆芯通过不同的泄漏点到达探测点所经历的路程不同,因此16N和19O的活度比值也随之不同,通过所测得的不同活度比,则可以反推出U形管泄漏的位置。将研制的监测装置在本院游泳池反应堆一回路水取样室进行了测量。结果表明,本装置性能良好,达到了设计的要求。 The principle idea for the monitoring system is based on the time is different when radiation nuclei ^16N and ^19O travel the different distances from reactor center via hot, bend and cold point of U-tube in steam generator. Because of the decay times T1/2 for 16N and ^19O are different , the ratios of ^16N to ^19O activities are different too . By using the different ratio, we can obtain the leak location of U-tube. The radioactivities and their ratio of ^16N to ^19O in our swimming pool reactor were measurement by use the monitoring system, the measured results show its quality is reliable.
出处 《核科学与工程》 CSCD 北大核心 2006年第2期128-133,共6页 Nuclear Science and Engineering
关键词 蒸汽发生器 ^16N、^19O放射核 活度比 steam generator ^16N.^19O nuclides radioactivity ratio
  • 相关文献

参考文献1

二级参考文献6

  • 1叶宗垣,丁声耀,李宇兵,丁锡祥,包宗渝,杨小芸.MeV能区HPGeγ探测器本征效率和γ剂量的确定[J].原子能科学技术,1994,28(5):419-427. 被引量:3
  • 2丁声耀 徐鹍.一种用辐射监测核动力堆放射性泄漏方法[P].中国专利:00114745.2002.
  • 3CHUNG Chien, CHAN Chengchang. Distribution of ^16N and ^19O in the reactor pool water of the THOR facility [J].Nuclear Technology,1995, 110:106-114.
  • 4FIRESTONE R B. Table of isotopes (Volume 1: A= 1-150) [M]. USA: Tohn Wiley & Sons,INC, 1996:21-275.
  • 5VAUGHN F J.^18O(n,τ) ^19O cross-sections from 0.2 to 1.0 MeV[J]. Bull Am Phys Soc, 1964,9:20-21.
  • 6BEARER W, WJTTENBACH A, BAERLSCHI P, et al. Reaction cross section and resonance integral for ^18O (n,τ)^19O[J]. J Inorg Nucl Chem,1971, 33:1 221-1 225.

共引文献1

同被引文献67

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部