变压器综合差动保护系统试验方法探讨 被引量:1

A Discussion on Test Methods for Transformer's Integrated Differential Protective System
下载PDF
导出
摘要 采用综合差动保护装置后,变压器联接组别相角差一般通过装置内部程序算法自动校正,变压器各侧电流互感器只要接成星形即可,由此产生了传统变压器差动保护系统试验的新问题。文章从研究试验电源相序对流入综合差动保护装置各侧电流的相角差,以及对装置内部计算差动电流的影响出发,结合综合差动保护装置具备电流测量和自动极性校正的特点,提出了新的系统试验方法。 Since the integrated differential protective system was adopted, the phase angle difference of the transformer' s connecting group grade has been automatically corrected by the built-in programming algorithm. The current mutual-inductor of the transformer' s each side is to be connected as a star. Thus some new problems appeared in tests on the traditional transformer' s differential protective system. Based on effect of the phase sequence of the test power source on phase angle difference caused by the current flown into the integrated differential protective device and on differential current calculation by the inner device, some suggestions are put forward in combination with characteristics of the current measurement and automatic polarity correction of the integrated differential protective device.
出处 《宝钢技术》 CAS 2006年第4期66-68,72,共4页 Baosteel Technology
关键词 变压器 差动保护 相序 transformer differential protection phase sequence
  • 相关文献

参考文献2

  • 1国家电力调度通信中心编.电力系统继电保护规定汇编(第二版)[M].北京:中国电力出版社,2001:116.
  • 2郑玉平,沈全荣,严伟.主设备继电保护技术的现状和发展[C].见:中国电机工程学会继电保护专业委员会编,2004年全国电力主设备保护学术研讨会专题报告.南京,2004:9.

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部