期刊文献+

青藏铁路风火山隧道喷锚支护施工技术 被引量:2

Construction Technique of Sprayed Concrete Anchor Support in Fenghuoshan Tunnel of Qinghai-Tibet Railway
下载PDF
导出
摘要 风火山隧道是目前世界上海拔最高的冻土隧道。详细介绍了风火山隧道喷锚支护中的低温早强喷射混凝土外加剂配制情况及喷射混凝土的配合比的确定,施工质量控制措施,以及锚杆作业情况。实践证明,该种喷锚支护施工技术解决了多年冻土隧道的喷锚支护难点。 Fenghuoshan Tunnel is the highest frozen earth tunnel in the world. The thesis mainly describes how to mix the additive of low-temperature early strength sprayed concrete, the proportion of sprayed concrete in the sprayed concrete anchor support in Fenhuoshan Tunnel, as well as quality control measures and the operation of anchor rod. It is proved that this construction technique has solved the difficulties of sprayed concrete anchor support in donkey' s years frozen earth tunnel.
作者 李培安
出处 《铁道建筑技术》 2006年第4期25-28,共4页 Railway Construction Technology
关键词 冻土隧道 喷射混凝土 试配试验 frozen earth tunnel sprayed concrete mixture and test
  • 相关文献

参考文献2

  • 1铁道部科技基函[2002]56号 青藏铁路高原冻土区混凝土耐久性技术条件
  • 2青藏总指[2002]100号 青藏铁路高原地区耐久性混凝土目标管理措施

同被引文献5

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部