摘要
皮家山隧道进口通过长达262 m的高压富水断层带,在施工中采取帷幕注浆固结堵水的施工措施,成功的通过了大断层,并保护了水环境,对以往隧道施工中地下水“以排为主”的施工原则是一种理念上的革新,对相似隧道施工具有一定的借鉴价值。
The entrance of Pijiashan Tunnel passes a fault of as long as 262m with abundant pressure water. Curtain grouting was adopted as water-stopping measure in the construction to make the tunnel pass the fault successfully and the water resources were protected, which is an innovation against the traditional methods mainly based on the "drainage" principle in dealing with ground water during construction, and is of reference value to similar tunnel construction.
出处
《石家庄铁道学院学报》
2006年第3期129-133,共5页
Journal of Shijiazhuang Railway Institute
关键词
皮家山隧道
高压富水断层
帷幕注浆
施工技术
Pijiashan tunnel
fault with abundant ground water
curtain grouting
construction technology