漕宝路地道泵站施工方案比选

A Comparison of Proposals for Construction of Caobao Rd Underpass Pumping Station
下载PDF
导出
摘要 介绍了上海市中环线漕宝路地道系统施工方案的比选方法。叙述了为全面评价方案的优劣,需对施工机械高度、交通影响、公用管线影响、满足盾构施工、工期要求、施工难度、方案成本等7个比选项目比较。比选结果较公正、客观。 Introduced hereby is the method of comparison of the proposals for construction of Caobao Rd Underpass System on the Mid Ring Rd in Shanghai, which covers 7 aspects to judge the proposals, such as the height of construction plant, impact on traffic and services, the use of shield machine for tunneling, period of construction, construction difficulty and the proposed cost. Selection from such a comparison seems more objective and fair.
出处 《中国市政工程》 2006年第4期76-78,共3页 China Municipal Engineering
关键词 地道 泵站 方案比选 折减系数 underpass pumping station comparison of proposals reduction factor