摘要
简述了湿法处理铜阳极泥、亚硫酸钠提银工艺,分析了分银渣中银质量分数指标波动的原因。通过优化工艺参数,改进操作条件,降低了分银渣中银的质量分数。
The hydrometallurgical process for recovering silver with Na2SO3 from copper slime is introduced, and the reasons of affecting silver content in silver-extracted sediment are discussed. The advices to reduce silver content in silver-extracted sediment by optimizing process parameters and improving operating conditions are put forwarded.
出处
《湿法冶金》
CAS
2006年第3期144-147,共4页
Hydrometallurgy of China
关键词
铜阳极泥
分银渣
银
工艺参数
优化
copper anode slime
silver-extracted sediment
silver
process parameter
optimization