试论工程成本与进度的综合控制 被引量:1

Discourse upon the Combination Control on Engineering Cost and Construction Progress
下载PDF
导出
摘要 在水电、房建工程项目管理中,为了对成本和进度进行有效控制,必须同时监控成本和进度的变化。有效成本、进度综合控制的关键是只要一发现成本、进度差异和低效率就积极地着手解决它,而不是放任不管。特别是在水电工程里,进度控制尤为重要,问题越早提出,则对整个项目的冲击和经济效益的影响就越小。 In the course of management of hydroelectric project and house construction,the change of engineering cost and construction progress must be monitored and controlled synchronously in order to control the cost and the progress effectively.The key for the effective combination control of engineering cost and construction progress is such that so long as the difference between the cost and the progress and the poor efficiency found it should be solved energetically rather than let things slide.Progress control is very important most of all for hydroelectric project,for the earlier the problem found the less the impact to whole project and economic benefit.
作者 陈华兵 陈杰
出处 《四川水力发电》 2006年第4期122-124,共3页 Sichuan Hydropower
关键词 进度控制 工程成本 综合控制 工程项目管理 水电工程 经济效益 低效率 Combination Control Estimate and Plan Collection of Actual Cost Calculation of Completed Cost
  • 相关文献

参考文献2

  • 1房屋建筑工程管理与实务,全国建造师执业资格考试用书编写委员会编写,建筑工业出版社,2004.10第一版;
  • 2水利水电工程施工技术,杨康宁主编,中国水利水电出版社,1994.10第二版

同被引文献1

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部