摘要 索风营水电站大坝位于“U”形河谷之中,坝肩开挖后的边坡坡比为1∶0.1或1∶0.2,属百m级高陡边坡。根据坝址区地形特点及对外交通条件,该工程大坝碾压混凝土入仓采用了汽车直接入仓、汽车+皮带机+仓内汽车转料、汽车+真空溜槽+仓内汽车转料3种入仓方式。本文对其入仓布置特点作一介绍,以望给其他工程施工作一借鉴。 The dam of Suofengying Hydropower Station is located on a U-shape valley. The sides after abutments were excavated belong to high steep one with height more than 100 m, and their ratio of slope is 1 : 0. 1 or 1 : 0. 2. According to topographic features of the dam area and traffic conditions, three methods for go-downing of rolling-compacting concrete for the dam of the project were adopted, these are directly go-downing by auto - truck, go- downing by auto-truck + belt conveyor + truck on the top of dam or by auto-truck + vacuum chute + truck on the top of dam. The writer introduces whole layout features of go-downing, and hopes these methods could be as reference for construction of other project.
作者 杨林 林希元
出处 《贵州水力发电》 2006年第4期28-31,共4页 Guizhou Water Power
关键词 水利工程施工 大坝 碾压混凝土 入仓特点 索风营水电站 conservancy engineering construction dam rolling-compacting concrete feature of go-downing Suofengying Hydropower Station
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部